01
Roof inspection
We walk the roof, check the attic decking with a moisture meter, and photograph every problem area. You get a written scope with photos the same day, plus a straight answer on repair versus replacement. Inspections take 45 to 60 minutes.
02
Material selection
We price GAF Timberline, Owens Corning Duration, CertainTeed, IKO, and Malarkey options side by side. You pick the shingle line and color, and we confirm the Miami-Dade County NOA for that exact assembly before anything is ordered.
03
Tear-off and deck prep
Crews strip the old shingles with a shingle remover, pull every nail, and inspect the decking for rot. Soft spots get replaced with new plywood. We install ice and water shield at the eaves and valleys, then roll synthetic underlayment across the field.
04
Shingle installation
Flashing goes in first at walls, chimneys, and pipe boots. Then we chalk a straight line, run the starter course, and nail each shingle with a roofing nail gun at the manufacturer's pattern. Ridge caps finish the job, and we run a magnetic sweep for nails twice.
05
Final walkthrough
We water-test the repairs, check the attic one last time, and walk the property with you. You get the warranty paperwork, the NOA number, and photos of the finished roof. Final cleanup happens before we pull out of your driveway.